Premium Commercial Cleaning · Melbourne
Post-Construction / Builders Cleaning

Builders cleans that hand the site over defect-free

The final clean between construction and handover — dust, residue, stickers and marks removed so the space presents the way the drawings promised.

Skirting and floor before and after a builders clean
Real result — before and after, on site.

Why it matters

Construction dust settles three times before it stops. A single rushed clean is what turns into a defect list at handover.

What's included

  • Full dust removal, including high surfaces
  • Paint, silicone and adhesive residue
  • Window and glass cleaning inside
  • Fixtures, fittings and joinery detailed
  • Floors sealed-ready and finished
  • Second and third pass as dust resettles

Who it's for

Builders, fit-out contractors, project managers and developers.

Where we work

Based in Bayswater, servicing Melbourne's eastern suburbs — Bayswater, Boronia, Ringwood, Croydon, Wantirna, Kilsyth, Ferntree Gully, Rowville, Mooroolbark, Lilydale, Mitcham, Box Hill and surrounds.

Common questions

What does a builders clean include?

Everything between practical completion and handover: full dust removal including high surfaces, paint and silicone residue, sticker removal, internal glass, joinery detail and finished floors.

Why do builders cleans need more than one pass?

Because construction dust keeps settling for days after the trades leave. We plan a second pass close to handover so the site presents clean on the day it matters.

Can you work to a handover deadline?

Yes — tell us the handover date when you request the quote and the clean is scheduled backwards from it.

Do you remove stickers and protective film?

Yes — stickers, protective film, paint spots and silicone residue are part of the builders clean, removed without damaging the finish underneath.

Can you clean a staged or partial handover?

Yes — staged projects are cleaned zone by zone as each area reaches practical completion, matching the builder's program.

Are window tracks and frames included?

Yes — internal glass, frames and tracks are detailed. Construction dust left in tracks is one of the most common defect-list items at handover.

More real results

Kitchen floor before and after cleaningChair arms before and after cleaningOffice chair before and after cleaning by Pink Glove

See all before & after results →

Get a quote for post-construction / builders cleaning

Tell us about your site and we'll come back with a fixed monthly figure — free and with no obligation.

Other services

WA